Elevators
The capital works fund plan from Sep 13, 2022, does not provide specific information on elevator maintenance due to varying lift contracts. The Strata Committee needs to ensure elevator maintenance is included in their planning.
Building Envelope
IMPORTANT
The building envelope requires significant attention due to various issues. Key concerns include potential asbestos in inaccessible areas and eaves/soffit, which are rated very high risk and need immediate action. Significant repairs are needed for the facade, including rotten fascia boards, doors, and windows, to prevent water intrusion. Roof maintenance and exterior repainting are scheduled, with costs projected over the next 15 years. Termite risks are high due to inadequate termite shields and wood rot, necessitating regular inspections and immediate remediation.
Plumbing maintenance includes repairs for water, sewer, and stormwater systems, with the next scheduled maintenance in 2027 at an estimated cost of $891. Future costs are projected to rise due to inflation. There are current water leaks below unit 1 from an old ceramic pipe, which need immediate repair to prevent termite activity and structural issues.
The building's windows require repair or replacement due to rot, which is crucial for maintaining the building's integrity and preventing water damage or air leakage. Additionally, window safety devices must be installed in all openable windows of apartments above a certain height, as mandated by the Strata Schemes Management Act 2015 and the Strata Schemes Management Regulation 2016. An allowance has been made for these installations, and quotations can be obtained from the office.
The building has had significant structural concerns. A collapsed load-bearing pier was reported in February 2022, requiring immediate attention to prevent further structural failure. Additionally, spalling concrete areas noted in October 2023 need investigation and repair. However, a September 2022 report indicated the overall structural integrity was sound, with no major issues in critical components. Regular maintenance is recommended to ensure ongoing stability and safety.
Mechanical Systems
The building features individual hot water systems, a car park mechanical ventilation system, and a common area air conditioning system. The condition and maintenance of these systems are currently undocumented, necessitating further investigation. Ongoing maintenance programs and regular assessments are recommended to ensure the functionality and longevity of these mechanical systems, especially in harsh environments.
Asbestos is present in various locations within the building, including eaves/soffit, backing boards near electrical units, asbestos cement products, and electrical mounting boards. It is non-friable with low contamination risk. Recommendations include keeping eaves/soffit painted or sealed, replacing backing boards when practical, and periodic monitoring. Inspections are required before any work on asbestos cement products, and further detailed inspections (Level 2 or Level 3) are suggested. Strict regulations on asbestos management exist, with significant fines for non-compliance. Renewal date for the Asbestos Report is April 19, 2029, with a renewal fee of $352.
Mold
The building condition report from Feb 12, 2022, highlights the importance of moisture management to prevent mold and fungal decay, which can attract termites. Poor ventilation in subfloors and wet areas is a concern. Regular maintenance and professional pest control services are recommended.
The building lacks fire stairs, posing a significant risk during emergencies. It is recommended to review fire safety measures for compliance with safety regulations. The capital works fund plan relies on external contractors for fire safety maintenance, with no specific details or allowances made unless directed by the Strata Committee or Representative.